KCL was engaged to do an engineering design for lifting frame to lift fabricated truss sections for the Birkenhead College re-roofing project. It is a good feeling to be able to assist in rebuilding our school in a safe and efficient way.

the Birkenhead College re-roofing project

And here is the final result, great team work:

 

KCL's Scope of Work included:

·      Review of truss design and proposed roof lift arrangements

·      Review/provide engineering design for lifting frame to lift fabricated truss sections

·      Review proposed roof truss lifting arrangements to estimate lift weights and centers of lift

·      Provide office based engineer assistance during construction

·      Carry out pre-lift site inspections to ensure frames correctly secured/supported for lift

·      Attend lifting operations as required to provide engineering assistance.

 

Call us now at KCL Engineering on
(+64) 9 522 8406
for your free initial consultation.